A package has one set package price, while its included activities still need individual scheduling and operational follow-up.

## Review the package and its components

When a package is booked, its included activities appear as separate components. For example, an adventure package might include airport transfers, a tour and a spa treatment.

1.  Open the package and check the guest, inclusions and payment information.
2.  Review every component on the Planns page.
3.  Set each component's date, time and provider.
4.  Confirm availability and arrange the required resources.
5.  Check participants, meeting details, Added Items and status.
6.  For roundtrip transfers, review both legs.
7.  If a meal plan is included, verify it on the guest's profile.

Purchasing the package does not mean that every provider arrangement has been confirmed. Each activity that's part of the package still consumes capacity and needs the usual operational checks.

## Understand included prices and balances

An included activity should be identified as **Included in package**. Its standalone Catalog price is not a second customer charge, and the package total should not be charged again against every component.

Included components have no independent outstanding balance unless an additional charge has explicitly been added outside the package inclusion. Review payment on the package itself as well as any separately charged extras.

## Handle additions separately

Before adding equipment, an upgrade or another service, check whether it is already included in the price of the package. If it is outside the package, review the additional amount and the applicable payment handling.

> **Example:** A package includes a guided tour. The guest chooses equipment that the hotel has configured as a separately charged addition. Retain the tour's package inclusion and verify the equipment charge; do not reapply the tour's normal standalone price as well.

Check the saved total and payment history before collecting or posting the extra. A zero-balance inclusion does not establish that every new addition is free.

## Packages from Cloudbeds

A properly linked Cloudbeds package can arrive with its components and meal plan. Review **Needs Review** and confirm the arrangements. Check whether the package was included in the room rate or billed as an add-on before posting another charge.

## Changes and cancellations

Review the package and all affected components. Coordinate with the relevant providers, verify each component's resulting status, and check any separate extra-charge or refund action. Do not assume cancelling the room reservation completes every activity cancellation.