⭐️ Maintenance report

Use the maintenance report to review repair jobs, check who is handling them, and keep progress notes together.

Your front desk, maintenance team and supervisors can refer to the same task details when handing work from one shift to the next.

Before you start

You need access to the maintenance report and permission to edit the tasks you manage. If the report or an editing control is unavailable, ask your administrator to check your access.

A Plann is a booking, arrangement or task recorded in Planniac. Maintenance work is recorded as a task, which you can open in Add/Edit for its full details.

Open and read the report

  1. Open Reports and select the maintenance report.
  2. Find the task you want to review.
  3. Check its date, guest or room, location, assigned staff, status and notes before making changes.

Detail

What to check

Date and time

When the work is scheduled.

Guest / Room

The guest and room linked to the task, or

Not guest related

for work that is not tied to a guest.

Location

Where the work needs to be done, such as a room or a shared area.

Activity name

The maintenance job to carry out.

Assigned staff

The person assigned to handle the job.

Status

The task’s current progress or outcome.

Status notes

Instructions, progress and anything the next person needs to know.

Update a task’s status and notes

  1. Find the correct task and check its location.
  2. Open its Status control.
  3. Select the status that matches the work’s actual progress or outcome.
  4. Confirm the change using the control shown.
  5. Open Status notes and add or update the practical details.
  6. Save the notes and check that the report shows the new status and text.

Use your hotel’s configured statuses. Mark work complete only after it has been done. If it cannot be completed, record the reason and what needs to happen next.

Example: A leaking tap needs a replacement part. Keep the task in the appropriate unfinished status and add a note such as β€œReplacement washer needed. Part ordered; check delivery tomorrow.” Once the repair is finished, update the status and record the outcome.

Change the scheduled date or time

  1. Find the maintenance task in the report.
  2. Select its calendar/time icon.
  3. Enter the new date and time.
  4. Confirm the change using the control shown.
  5. Check the updated schedule in the report and let the responsible team member know about the change.

Assign or change maintenance staff

  1. Open the task’s Assigned staff control.
  2. Select the team member who should handle the job.
  3. Confirm the selection using the control shown.
  4. Check the name displayed on the report.

Check the staff set as selectable for a task

The staff selection follows the roles configured for that task activity (in Settings > Activity). It can include staff from more than one role; it is not limited to people with the Maintenance role.

After confirming an assignment, check the saved name. The maintenance report, Planns and Add/Edit should show the same assigned staff for the task.

Open the full task details

  1. Select the task’s activity name to open its Add/Edit page.
  2. Review the task and any guest or room information.
  3. Update the relevant task details. Use Location in the task details for the place where the work is needed.
  4. Save your changes.
  5. Return to the maintenance report and check the result.

Use Not guest related when the work is not connected to a guest, such as a repair in a shared area. A clear location still helps the team find the job.

Use the report for shift handover

Before handing over, review unfinished work with the next team. Check the responsible person, scheduled time and latest notes. Record what has been tried, what is still needed and the next action so the next shift can continue without repeating the same investigation.

FAQ

Can maintenance work be recorded without a guest?

Yes. Use Not guest related for tasks that are not tied to a guest. Record a specific location so staff know where to go.

Do I have to open Add/Edit for every update?

No. The report has controls for status, status notes, date/time and assigned staff. Open Add/Edit when you need to review or change the fuller task details.

Which status should I choose?

Use the status your hotel has configured for the actual outcome. Ask your supervisor if you are unsure which one represents completed work, unfinished work or a task that could not be completed.

Troubleshooting

I cannot see the report or edit a task

Ask your administrator to check your access and the permissions for your role.

The location is blank

Open the task in Add/Edit, check Location in the task details, and save the correct place. Return to the report to verify it. If the field is unavailable or the saved location does not appear, contact your administrator or Planniac support.

An assignment does not match after saving

Compare the same task in the maintenance report, Planns and Add/Edit. Ask your supervisor to confirm who should do the work. Report the mismatch to your administrator or Planniac support with the task reference and screenshots of the different assignments.

A change does not appear after saving

Reopen the task and check its saved details before entering the change again. If the result remains unclear, ask your administrator or support to review the task.

Contact your administrator or Planniac support with the task reference and the message you see. Do not create a duplicate task just to work around the problem.