β Understand activity scheduling types
Overview
Activity scheduling types are configured in Settings > Activity and priced in Catalog.
Each activity uses one of four scheduling types. The scheduling type determines how availability is managed and how the pricing table is displayed in the Catalog.
Choose the scheduling type that best matches how the activity is sold and operated.
Timeslots
Use timeslots when an activity can be offered multiple times throughout the day.
Examples:
- Snorkeling tour
- Scheduled shuttle service
- Sunset cruise
- Group fitness class
With timeslots, you can:
- Create multiple set departure times
- Set start and end times for each departure
- Apply capacity restrictions
- Manage availability separately for each timeslot
Example:
- 9:00 AM Snorkeling Tour (12 spaces)
- 1:00 PM Snorkeling Tour (12 spaces)
- 4:00 PM Snorkeling Tour (12 spaces)
Standard times
Use standard times when an activity normally operates once per day at a fixed time. A standard time activity needs to have at least a start time.
Examples:
- Cave tubing & zipline
- Full-day island excursion
- Daily winery tour
- Guided nature hike
With standard times, you can:
- Define a single start and end time
- Apply capacity restrictions
- Sell the activity on multiple dates without creating separate timeslots
Example:
- Cave tubing & zipline
- Daily departure: 8:00 AM
- Daily return: 4:00 PM
- Capacity: 20 guests
Duration-based
Use duration-based scheduling when the length of the activity is important but there is not a set schedule.
Examples:
- 60-minute massage
- 90-minute facial
- 2.5-hour airport transfer on request
- 4-hour private charter
Duration-based activities can be configured:
- With specific appointment times
- Without fixed appointment times
- With or without capacity restrictions
The system uses the activity duration when calculating availability and scheduling.
Example:
- Deep tissue massage
- Duration: 60 minutes
Or:
- Airport transfer
- Duration: 2.5 hours
On-demand
Use on-demand scheduling when there is no fixed schedule or defined duration.
Examples:
- Equipment rental
- Special requests
- Concierge services
- Custom experiences
With on-demand activities:
- No times are required
- No duration is required
- Guests simply request the service
- Staff coordinate the details separately
This is the most flexible scheduling option and is ideal for activities that do not follow a standard operating schedule.
Choosing the right scheduling type
Activity type | Recommended scheduling |
|---|---|
Multiple, fixed time departures per day | Timeslots |
One set departure time per day | Standard times |
Appointments or services with a defined length but flexible times | Duration-based |
Flexible requests with no schedule | On-demand |
The scheduling type is configured in Settings > Activity and directly affects the availability and pricing options shown in Catalog.
Choose who can carry out a task
The roles configured for a task activity determine which staff members you can assign. A team member is eligible when they have at least one of those roles.
If no roles are defined for the activity, Planniac uses the task type to determine the available roles and staff.
If a person is missing from the selection, ask your administrator to check both the activityβs roles and the team memberβs roles. A person does not need every role listed on the activity; one matching role is enough.